Search

Signalling the end of an era in Brandon

PUBLISHED: 16:30 08 August 2011

It will be the end of an era in Brandon when the town’s railway signal box is replaced next summer with a modernised version.

The box, built in 1931, will no longer be in use and the crossing will instead be controlled from a Cambridge power signal box. It is part of a £20m upgrade by Network Rail between Ely and Norwich which will see nine signal boxes and a level crossing control box decomissioned.

In Brandon a manually controlled barrier will be put in place which will detect the crossing is clear before lowering the barriers.

A Network Rail spokesman said they were “equally” as safe as those they were replacing and added: “As the number of passenger and freight trains continues to rise, it’s right that we invest in the latest technology to provide passengers with a safe, reliable, efficient railway that is fit for the future.”

Chairman of the Friends of Brandon Station, Stephen Dean, said the group had applied for the signal box to be listed.

He added: “It’s picturesque and there are red and white signals which go up and down and so it’s nice to see but obviously an old system like that falls to the inevitable march of time. I think it’s a loss for the town. It’s a nice-looking building it’s been there for so long and you’re losing that human contact.

Visit www.brandonstationfriends.com


If you value what this story gives you, please consider supporting the Thetford and Brandon Times. Click the link in the orange box below for details.

Become a supporter

This newspaper has been a central part of community life for many years, through good times and bad, serving as your advocate and trusted source of local information. Our industry is facing testing times, which is why I’m asking for your support. Every single contribution will help us continue to produce award-winning local journalism that makes a measurable difference to our community.

Thank you.

Most Read

Most Read

Latest from the Thetford and Brandon Times